Our cladding teams install and level aluminum composite panel (ACP) and stone facades on both high-rise and low-rise structures — the same real crews shown in the photos on this page, working on an active high-rise installation in Al Barsha, Dubai.
Every panel is set to precise architectural tolerances using laser levels and structural checks, not eyeballed — facade work is one of the most visible parts of a building, and it has to read as flat and true from the street.
Facade cladding is unforgiving — a panel that's a few millimetres out is visible from the ground. Our crews check plumb and alignment at every panel, not just at the end of a run.
ACP facade cladding installed on high-rise and commercial structures.
Natural stone facade finishing for villas and commercial facades.
Installation of glass, mirrors and supporting facade elements.
Sealant and weatherproofing detail work at every panel joint.
Working from a suspended platform dozens of floors up means every panel install is also a safety operation — harnesses, tie-offs and a second set of eyes are non-negotiable. Our site crews follow the same HSE protocol on facade work as on ground-level construction, with no exceptions for height.